Panel placement
Check that panels sit on the unshaded part of the roof and that walkway access is left for cleaning.

How it works
Thirteen clear steps from signing up to switch-on. Here is what happens, what you pay and when, and what to keep ready.
The process
Create an account with email or Google, or leave your name and mobile number on any form. Either way you get a unique Customer ID.
Residential, Commercial or Industrial. This decides which documents we ask for later.
Residential customers also pick the PM Surya Ghar subsidy (up to ₹78,000) or to go ahead without a subsidy.
Our team prepares it and shares it on your dashboard. It is a basic quotation for your capacity; the final price can change after the site survey.
Review it, tick Terms & Conditions and Guarantees, then approve.
You get a payment receipt straight away and unlock the site survey calendar.
Pick a green date on the calendar. Red dates are not available.
We assign a Success Manager to you. They show up on your dashboard and you are notified.
After the site survey your Success Manager shares the updated quotation. Review it and approve before the design.
We upload the design to your dashboard. Check it and approve before moving on.
With solar finance there is nothing more to pay now: the ₹5,000 advance is your only payment. Otherwise (online or cash), pay 30% of the approved quotation to unlock the paperwork stage.
Upload the documents for your category, any optional ones for a correction on your bill, and the finance documents if you chose solar finance.
Choose your delivery and installation date. Without finance, pay 60% (less the advance) before installation and the final 10% after it. Then we complete net metering.
The site survey
The survey helps the team turn your electricity use and property conditions into a practical system layout and quotation.
Documents
You upload these in the last step, after your design is approved and you choose finance or pay 30%. Pick your category to see the list.
First two pages. Needed to transfer your subsidy.
Taken from your account.
Taken from your account.
Need a correction on your electricity bill? Read in the document we have given to you.
Payments
Timing
The account, approval and payment stages are quick. The survey and the DISCOM stages are where the calendar depends on other people.
Sign up, choose a category, upload a bill and receive your basic quotation.
Same dayApprove the terms and guarantees, then pay ₹5,000 to unlock the survey calendar.
Same dayAn engineer visits and records the roof, shade, board and cable route.
Within a week of bookingLayout and equipment are uploaded to your dashboard for sign-off.
2–4 working days after surveyChoose solar finance (no further payment now) or pay 30% of the approved quotation, then upload the documents for your category.
Same weekInstall, DISCOM inspection, net meter and handover.
2–4 days, then 1–3 weeks for the meterInstallation cannot begin before the design is approved and the 30% stage is paid, so a fast start comes from approving quickly rather than from rushing the crews.
Before you approve
The quotation you receive after sign-up is a basic one for your required capacity. The final figure is confirmed after the site survey, and the design is what you approve before paying the 30% stage.
Read the design rather than only the price. Panel placement, inverter model and the structure determine how the system performs for the next twenty-five years.
Check that panels sit on the unshaded part of the roof and that walkway access is left for cleaning.
The rating should match your array, and the model should be one with a service presence in Madhya Pradesh.
Elevated or flush, galvanised or aluminium, and how it is anchored to your specific roof.
The advance, the 30% stage and the balance should each map to clearly completed work.
Practical notes
Do that before approving the design. The quotation is revised and you approve the updated figure before any further payment is made.